Give us feedback!

Cross Mizen Head Bridge, Ireland

The original Mizen Head Bridge construction started in 1908 and was completed in March 1910. The Bridge had lasted nearly one hundred years when engineers surveying it discovered it was unsafe. It was closed overnight in February 2005. The new Mizen Head Footbridge was opened in August 2011 and is a reinforced concrete through-arch structure that spans 50m across a sea gorge to connect the island of Cloghán, at the tip of Mizen Head, with the mainland in South-west Cork, Republic of Ireland.
Show more
5.0 out of 5 Write a Review
No Ratings Yet
Flag as inappropriate
Share on Tumblr Share via E-mail